RBC_Template 0.1.0 build 5fb9afb
Workspace master specification — safety-related railway software around an ERTMS Radio Block Centre (RBC), CENELEC EN 50128 / SIL 4
|
Status: draft for management presentation and for transfer to Capella, 2026-09-25.
Superseded by the Capella model (2026-10-02): see Capella architecture baseline (2026-10-02). Kept for its LC/IF/PC numbering. Where they differ the model wins; notably LC-05 site negotiation now belongs to RTE Redundancy Services. Written for: top managers (sections 1 to 4) and the modeller who will enter this in Capella (sections 5 to 8).
The names, responsibilities and status below come from the repository. The hardware layout is a proposal (section 4): the workspace tests the software in containers, and the commercial target platform is named in ARCHITECTURE.dox but its board layout is not defined in the code. Items that need a decision by the hardware architect are listed in section 8.
The RBC is a redundant Radio Block Centre for ERTMS/ETCS. It is built as two identical sites (WEST and EAST). At any moment one site is ONLINE and serves trains, the other is STANDBY and can take over.
Each site has three kinds of processing element:
Two further servers, each on its own hardware, are planned: a Train Communication Server (radio/ISDN access) and an AI Diagnostic Server (log analysis). Neither is implemented; both are placeholders.
| Actor | What it exchanges with the RBC | Today |
|---|---|---|
| Train (onboard EVC) | Position reports, session and movement-authority messages (Subset-026) | Simulator |
| Interlocking (IL) | Route commands and route/signal status | Simulator |
| CTC / dispatcher system | Train information, alarms | Simulator |
| Dispatcher / operator | Confirmation that the other site is not ONLINE; maintenance actions | Interim file trigger |
| Key Management Centre (KMC) | Off-line key files (Subset-114) | Files relayed by Gateway |
| Log collector / JRU | Event log (RFC 5424 syslog) | Optional |
| Customer network (GSM-R ISDN / FRMCS) | Radio path to trains | Not built |
Numbering is the proposed Capella Logical Component id. "Tier" is the safety tier from the safety plan. "Status": built exists and is tested; stub exists as a stub; partial works with a stated limit; planned** placeholder only.
| Id | Logical module | Responsibility | Tier | Status |
|---|---|---|---|---|
| LC-01 | ERTMS Procedure Engine (RBC_GP) | Runs the Subset-026 procedures per train: session start and end, position handling, movement-authority grant, emergency stop, shunting, handover. | Vital | built |
| LC-02 | IL and CTC Adaptation (RBC_GA) | Turns interlocking route state and CTC requests into route and movement-authority decisions for the engine. | Vital | built |
| LC-03 | Site Data (RBC_SA) | Track layout, signals, balises and routes for one site, generated from the railML model. Also builds the installers. | Vital data | built |
| LC-04 | A/B Cross-Comparison | Each cycle both channels compare their computed sessions and outputs. A mismatch is a fault. | Vital | built |
| LC-05 | Site Negotiation and Standby Sync | Decides which site is ONLINE, exchanges the state snapshot between sites, promotes and demotes. | Vital | partial (see 3.5) |
| LC-06 | Key Management Client (Subset-114) | Verifies and decrypts key files delivered by the Gateway, writes the resulting key for the safe-communication layer. | Vital | partial (nothing consumes the key yet) |
| Id | Logical module | Responsibility | Tier | Status |
|---|---|---|---|---|
| LC-10 | Application Manager | Runs the application in ordered stages every cycle and starts the checkpoint. | Vital | built |
| LC-11 | Redundancy Services | Voting, cross-comparator, checkpoint (commit or discard the cycle's output), dual-channel link, state transfer, redundancy configuration. | Vital | built |
| LC-12 | Safe State Manager | Owns the reaction to any fault: safe state or controlled reboot; the application only registers cleanup. | Vital | built |
| LC-13 | Communication Services (PI-API, Flow) | Named data flows between processes, independent of transport. | Vital | built |
| LC-14 | Operating-System Abstraction | Timer, log, memory, non-volatile storage and channel services behind one interface. | Vital | built |
| LC-15 | POSIX OS Adapter | Implements LC-14 and the transport on Linux and macOS. | Vital target | built |
| LC-16 | DDS Protocol Adapter | Intended to carry flows over DDS. | Non-safety today | stub |
| LC-17 | Safe Communication (Subset-037, Subset-098) | Safety and authentication layer on the train and interlocking links. The library exists; it is not yet terminated in the vital channels. | Vital | partial |
| Id | Logical module | Responsibility | Tier | Status |
|---|---|---|---|---|
| LC-20 | Train Relay | Carries train traffic between the outside and both vital channels. | Non-vital | built |
| LC-21 | Interlocking Relay | Same for the interlocking. | Non-vital | built |
| LC-22 | CTC Relay | Same for CTC. | Non-vital | built |
| LC-23 | Status and Health Broker | Collects status from every unit and publishes one site health summary. | Non-vital | built |
| LC-24 | Log Forwarding (JRU) | Sends the channels' event log to a log collector as RFC 5424 syslog. Off unless configured. | Non-vital | built |
| LC-25 | Key File Relay | Passes off-line key files from a directory to both channels without reading them. | Non-vital | built |
| LC-26 | Maintenance Web | Read-only status page and JSON for maintenance staff. | Non-vital | built (no software update, no login) |
| LC-27 | Takeover Confirmation Relay | Delivers the dispatcher's confirmation that the other site is not ONLINE to both channels. | Non-vital | in progress, interim file trigger |
| Id | Logical module | Responsibility | Tier | Status |
|---|---|---|---|---|
| LC-30 | Train Communication Server | Access point between the customer network (GSM-R ISDN, FRMCS) and the RBC, reaching it through the Gateway. | Non-vital | planned |
| LC-31 | AI Diagnostic Server | Collects logs from the RBC and the Train Communication Server and looks for likely problems with AI models. | Non-vital | planned |
| LC-40 | Test Access Point and Simulators | Stand-ins for train, interlocking, CTC and the access point, plus the end-to-end test suite. Not deployed. | Tooling | built |
A site never becomes ONLINE by itself. It becomes ONLINE only in one of three ways:
If a site that lost contact meets a counterpart that took over meanwhile, it yields and becomes STANDBY. Status: rule 3 and the yield are being implemented; rules 1 and 2 exist. Standby synchronisation modes (cold, warm, hot) are described in application/RBC_GP/docs/STANDBY_AND_SITE_LINK_ARCHITECTURE.dox; warm is built behind a setting and not yet verified, hot is not built.
The products that implement these modules, their grouping, dependencies and hand-over artifacts are a separate document: PRODUCT_STRUCTURE.dox.
Physical elements. "Site" elements exist once per site (WEST and EAST), so the RBC contains two of each.
| Id | Hardware element | Per | Holds |
|---|---|---|---|
| PC-01 | Vital Unit A | site | One vital channel. Built with one compiler (channel A). |
| PC-02 | Vital Unit B | site | The second vital channel. Built with a different compiler (channel B) for diversity. |
| PC-03 | Gateway Unit | site | The non-vital Gateway. Same enclosure or rack as the vital units, separated from them by process and network. |
| PC-10 | Train Communication Server | RBC (one or more) | Own dedicated hardware. Planned. |
| PC-11 | AI Diagnostic Server | RBC | Own dedicated hardware. Planned. |
| PC-20 | KMC workstation | outside the RBC | Off-line key management. External. |
| PC-21 | Maintenance terminal | outside the RBC | Browser for the maintenance page and the dispatcher confirmation. |
Physical links:
| Id | Link | Between | Carries |
|---|---|---|---|
| PL-01 | Channel peer link | Vital Unit A and Vital Unit B of the same site | Cross-comparison and checkpoint |
| PL-02 | Inter-site link | Vital Unit A (WEST) and A (EAST); B (WEST) and B (EAST) | Site negotiation, state snapshot |
| PL-03 | Relay links | Gateway Unit and each vital unit of the same site | Train, interlocking and CTC envelopes, status, key files, takeover confirmation |
| PL-04 | Customer network | Train Communication Server and trains | GSM-R ISDN or FRMCS radio path |
| PL-05 | Service network | Gateway Unit, servers, maintenance terminal | Logs, status, maintenance access |
X = runs there. The same module is instantiated on every element in its column, in each site.
| Logical module | PC-01 Vital A | PC-02 Vital B | PC-03 Gateway | PC-10 Train Comm Server | PC-11 AI Server |
|---|---|---|---|---|---|
| LC-01 ERTMS Procedure Engine | X | X | |||
| LC-02 IL and CTC Adaptation | X | X | |||
| LC-03 Site Data | X | X | |||
| LC-04 A/B Cross-Comparison | X | X | |||
| LC-05 Site Negotiation and Standby Sync | X | X | |||
| LC-06 Key Management Client | X | X | |||
| LC-10 to LC-15 Platform (manager, redundancy, safe state, communication, OS abstraction, POSIX adapter) | X | X | X (subset) | ||
| LC-16 DDS Adapter | (stub) | (stub) | |||
| LC-17 Safe Communication | X | X | X (access-layer part) | ||
| LC-20 Train Relay | X | ||||
| LC-21 Interlocking Relay | X | ||||
| LC-22 CTC Relay | X | ||||
| LC-23 Status and Health Broker | X | ||||
| LC-24 Log Forwarding (JRU) | X (source) | X (source) | X | ||
| LC-25 Key File Relay | X | ||||
| LC-26 Maintenance Web | X | ||||
| LC-27 Takeover Confirmation Relay | X (receiver) | X (receiver) | X | ||
| LC-30 Train Communication Server | X | ||||
| LC-31 AI Diagnostic Server | X |
flowchart TB
subgraph EXT[Outside the RBC]
TRAIN[Train EVC]
IL[Interlocking]
CTC[CTC]
KMC[KMC workstation]
MT[Maintenance terminal]
end
subgraph SRV[Dedicated servers]
TCS[PC-10 Train Communication Server]
AI[PC-11 AI Diagnostic Server]
end
subgraph WEST[Site WEST]
GW1[PC-03 Gateway Unit]
A1[PC-01 Vital Unit A]
B1[PC-02 Vital Unit B]
GW1 <-->|PL-03| A1
GW1 <-->|PL-03| B1
A1 <-->|PL-01| B1
end
subgraph EAST[Site EAST]
GW2[PC-03 Gateway Unit]
A2[PC-01 Vital Unit A]
B2[PC-02 Vital Unit B]
GW2 <-->|PL-03| A2
GW2 <-->|PL-03| B2
A2 <-->|PL-01| B2
end
A1 <==>|PL-02| A2
B1 <==>|PL-02| B2
TRAIN <-->|PL-04| TCS
TCS <--> GW1
TCS <--> GW2
IL <--> GW1
IL <--> GW2
CTC <--> GW1
CTC <--> GW2
KMC -.->|key files| GW1
KMC -.->|key files| GW2
MT -->|PL-05| GW1
MT -->|PL-05| GW2
GW1 -->|logs| AI
GW2 -->|logs| AI
TCS -->|logs| AI
flowchart LR
subgraph VITAL[Vital channel A or B]
LC01[LC-01 ERTMS Procedure Engine]
LC02[LC-02 IL and CTC Adaptation]
LC03[LC-03 Site Data]
LC04[LC-04 Cross-Comparison]
LC05[LC-05 Site Negotiation]
LC06[LC-06 Key Client]
LC17[LC-17 Safe Communication]
PLAT[LC-10..15 Safe Computing Platform]
LC01 --> PLAT
LC02 --> LC01
LC03 --> LC01
LC04 --> PLAT
LC05 --> PLAT
LC06 --> LC17
LC17 --> PLAT
end
subgraph GW[Gateway non-vital]
LC20[LC-20 Train Relay]
LC21[LC-21 IL Relay]
LC22[LC-22 CTC Relay]
LC23[LC-23 Status Broker]
LC24[LC-24 JRU Forwarding]
LC25[LC-25 Key File Relay]
LC26[LC-26 Maintenance Web]
LC27[LC-27 Takeover Confirmation]
LC23 --> LC26
end
LC20 <--> LC17
LC21 <--> LC17
LC22 <--> LC17
LC25 --> LC06
LC27 --> LC05
LC24 -.-> LC23
| Id | From to | Content | Vital data? |
|---|---|---|---|
| IF-01 | Train Communication Server to Train Relay (LC-30 to LC-20) | Train messages | Carried, not trusted |
| IF-02 | Train Relay to Vital channels (LC-20 to LC-01) | Train envelopes, both channels | Verified by channel |
| IF-03 | Interlocking / CTC relays to Vital channels | IL and CTC envelopes | Verified by channel |
| IF-04 | Vital A to Vital B (LC-04) | Cross-comparison samples, checkpoint | Vital |
| IF-05 | Vital channel to its counterpart in the other site (LC-05) | Role negotiation, state snapshot | Vital |
| IF-06 | Vital channels to Status Broker (LC-23) | Status, log events | Non-vital |
| IF-07 | Key File Relay to Key Client (LC-25 to LC-06) | Opaque key files | Verified by channel |
| IF-08 | Takeover Confirmation Relay to Site Negotiation (LC-27 to LC-05) | Dispatcher confirmation | Non-vital trigger, acted on by vital side |
| IF-09 | Maintenance Web to maintenance terminal | Status page and JSON | Non-vital |
| IF-10 | Log Forwarding to log collector or AI server | RFC 5424 syslog | Non-vital |
| Capella element | Use |
|---|---|
| System Analysis: actors | The rows of section 2 |
| Logical Architecture: components | LC-xx from section 3. Group LC-01..06, 10..17 under "Vital channel", LC-20..27 under "Gateway" |
| Logical Architecture: exchanges | IF-xx from section 5 |
| Product breakdown (PBS) | PRODUCT_STRUCTURE.dox; product = configuration item, linked to its LC-xx |
| Physical Architecture: node components | PC-xx from section 4 |
| Physical Architecture: physical links | PL-xx from section 4 |
| Allocation | Deploy each LC onto the PC columns of the matrix in 4.1 |
| Properties | Add "tier" and "status" as property values on each LC |
The existing model specification is architecture/capella/. It models the products; this document adds the RBC-level logical and physical view above it.