|
RTE RBC 2oo2 Reference Application 0.1.0 build 0006685
SIL 4 2oo2 Dual-Site Fault-Tolerant ERTMS Radio Block Centre Reference Architecture
|
Msg 129: Validated Train Data. More...
#include <ab_gp_ertms_train_messages.h>
Data Fields | |
| rbc_train_to_track_header_t | header |
| rbc_packet_0_position_report_t | position_report |
| rbc_distance_m_t | l_train |
| rbc_speed_kmh_t | v_maxtrain |
| uint8_t | m_loadinggauge |
| uint8_t | m_axleload |
| bool | m_airtight |
Msg 129: Validated Train Data.
Definition at line 228 of file ab_gp_ertms_train_messages.h.
| rbc_train_to_track_header_t rbc_msg_129_validated_train_data_t::header |
Definition at line 230 of file ab_gp_ertms_train_messages.h.
| rbc_packet_0_position_report_t rbc_msg_129_validated_train_data_t::position_report |
Definition at line 231 of file ab_gp_ertms_train_messages.h.
| rbc_distance_m_t rbc_msg_129_validated_train_data_t::l_train |
Train total length (m)
Definition at line 232 of file ab_gp_ertms_train_messages.h.
| rbc_speed_kmh_t rbc_msg_129_validated_train_data_t::v_maxtrain |
Train maximum speed (km/h)
Definition at line 233 of file ab_gp_ertms_train_messages.h.
| uint8_t rbc_msg_129_validated_train_data_t::m_loadinggauge |
Loading gauge profile
Definition at line 234 of file ab_gp_ertms_train_messages.h.
| uint8_t rbc_msg_129_validated_train_data_t::m_axleload |
Axle load category
Definition at line 235 of file ab_gp_ertms_train_messages.h.
| bool rbc_msg_129_validated_train_data_t::m_airtight |
Airtight equipment fitted
Definition at line 236 of file ab_gp_ertms_train_messages.h.