RTE RBC 2oo2 Generic Application 0.1.0 build 308eda7
IL/CTC route and train logic for the RBC_GP reference RBC
Loading...
Searching...
No Matches
Data Structures
Here are the data structures with brief descriptions:
 Cab_ga_il_route_cmd_tDecoded RBC_MSG_IL_ROUTE_CMD payload
 Cab_ga_il_route_indication_tRBC_MSG_IL_ROUTE_INDICATION payload (RBC -> IL)
 Cab_ga_il_status_msg_tDecoded RBC_MSG_IL_STATUS payload
 Cab_ga_route_fsm_result_tResult of applying one IL route command to a route's FSM
 Cab_ga_shunting_context_t
 Cab_site_ga_route_layout_tOne route's static layout entry (railML interlocking <route>) - GA's own full definition (not a reduced projection of anyone else's table - GA is the sole owner of route topology now)
 Cga_channel_ctx_t
 Cgateway_c_ctc_handler_state_t
 Cgateway_c_il_handler_state_t
 Cil_pending_route_event_tQueued route event for IL notification dispatch