Safety Plan

Document ID:** [PROJECT]-SAFETY-PLAN-26.08
Project:** [Railway System Name - e.g., ERTMS RBC]
SIL Target:** 4
Version:** 1.0
Date:** [Date]
Status:** [DRAFT / APPROVED]
Author:** [Name, Functional Safety Manager]


1. Introduction

1.1 Purpose

This Safety Plan defines the overall strategy, organization, and approach for developing [System Name] to meet EN 50128:2011 SIL 4 safety requirements.

1.2 Scope

  • In Scope: All software components, including RteFramework baseline
  • Out of Scope: Hardware design, RTOS implementation (if externally supplied)

1.3 Normative References

  • EN 50128:2011 — Railway applications - Software on board rolling stock - Software safety
  • EN 50129:2018 — Railway applications - Communication, signalling and processing systems - Functional safety and technical safety
  • MISRA C:2012 — Guidelines for the use of the C language in critical systems
  • CENELEC Product Safety Standards

2. Lifecycle Model

2.1 Development Lifecycle

Requirements Phase
↓
Design Phase
↓
Implementation Phase
↓
Verification Phase
↓
Assessment Phase (Notified Body)
↓
Deployment & Operation

Process:** [V-Model / Agile / Spiral - describe your chosen model]

2.2 Verification Strategy

Activity Phase Responsibility Output
Requirements Review Requirements System Architect Review Report
Design Review Design Architecture Lead Design Review Report
Code Review Implementation Code Review Team Code Review Report
Static Analysis Implementation QA / Tools MISRA Report
Unit Testing Implementation Developers Test Report
Integration Testing Verification Test Team Integration Test Report
System Testing Verification Test Team System Test Report
Functional Safety Assessment Assessment Notified Body Assessment Report

3. Organization & Responsibilities

3.1 Roles

Role Name Responsibilities
Functional Safety Manager [Name] Overall safety strategy, safety approval
Project Manager [Name] Schedule, resources, stakeholder management
System Architect [Name] System design, architecture decisions
Development Lead [Name] Code quality, implementation standards
QA / Test Lead [Name] Testing strategy, verification
Configuration Manager [Name] Change control, baselines, traceability

3.2 Review Authority

  • Technical Reviews: [Name, Role]
  • Safety Reviews: [Functional Safety Manager]
  • Management Approval: [Project Manager / Program Manager]

4. Tools & Methods

4.1 Development Tools

Tool Purpose Justification
CMake Build system Standard, widely supported
C99 Compiler Translation Matches EN 50128 qualified toolchains
[cppcheck / Tool] Static Analysis MISRA compliance verification
[Unit Test Framework] Unit Testing [e.g., CUnit, Unity]
Git Version Control Traceability, change history

4.2 Static Analysis Tools

  • Primary: [cppcheck / LDRA / Parasoft]
  • Standard: MISRA C:2012
  • Coverage Goal: 100% of source code
  • Deviation Process: All deviations documented and approved

4.3 Testing Methods

  • Unit Testing: All modules tested individually
  • Integration Testing: Modules tested together
  • System Testing: Full system tested end-to-end
  • Coverage Target: >90% code coverage (SIL 4)

5. Coding Standards

5.1 Language & Standard

  • Language: C99 (C11 compatible)
  • Standard: MISRA C:2012 Mandatory & Required rules
  • Exceptions: [Document any deviations and rationale]

5.2 Key Constraints

✓ No dynamic memory allocation (malloc/free banned)
✓ Explicit error handling (no exceptions)
✓ Checked type conversions (no bare casts)
✓ Bounded operations (no strcpy, sprintf)
✓ No recursion
✓ Pointer validation required

5.3 RteFramework Baseline

  • Version: 0.1.0
  • Usage: OS Abstraction Layer (OAL)
  • Verification: Per SAFETY_APPLICATION_CONDITIONS.dox
  • Modifications: [List any modifications to RteFramework code]

6. Traceability & Configuration Management

6.1 Traceability

  • Bidirectional: Requirements ↔ Design ↔ Code ↔ Tests
  • Matrix Tool: [Spreadsheet / Dedicated tool]
  • Coverage: 100% of requirements traced to implementation
  • Update: Real-time with changes, reviewed at phase gates

6.2 Configuration Management

  • Baseline: Established at end of each phase
  • Change Control: Formal change request process (see CM Plan)
  • Build Management: Reproducible builds, version controlled
  • Release Management: Tagged releases for assessment

7. Requirement Traceability

7.1 Requirement Categories

Category Count Owner Status
Functional Requirements [n] System Architect [Draft / In Review / Approved]
Safety Requirements [n] Functional Safety Manager [Draft / In Review / Approved]
Design Constraints [n] System Architect [Draft / In Review / Approved]
Quality Requirements (MISRA, etc.) [n] QA Lead [Draft / In Review / Approved]

7.2 Requirement Sources

  • Safety standards (EN 50128, EN 50129)
  • Customer specifications
  • HARA findings (safety-driven requirements)
  • Architectural patterns (RteFramework)

8. Review & Assessment

8.1 Internal Review Gates

Gate Input Output Approval
Requirements Gate SRS, HARA Approved requirements Functional Safety Manager
Design Gate Architecture, Design Review Report Approved design System Architect
Code Gate Code Review Report, Static Analysis Approved code Development Lead
Test Gate Test Results, Coverage Report Approved test evidence QA Lead
Assessment Readiness All above evidence packaged Ready for Notified Body Functional Safety Manager

8.2 Notified Body Assessment

  • Timing: [Target date for assessment start]
  • Body: [CENELEC-certified lab]
  • Scope: Full SIL 4 assessment
  • Expected Duration: 3-6 months
  • Evidence Package: [List key documents to be submitted]

9. Risk Management

9.1 Technical Risks

Risk Probability Impact Mitigation
MISRA violations found late Medium High Early static analysis, code review before implementation
Test coverage inadequate Low High Coverage tools, coverage goals set early
RTOS OSAdapter issues Medium High Early OSAdapter design review, prototype testing
Schedule overrun Medium Medium Buffer in schedule, early identification of issues

9.2 Organizational Risks

Risk Mitigation
Key personnel unavailability Cross-train team members
Tool unavailability Qualified backup tools identified
Notified Body delays Engage Notified Body early

10. Documentation & Evidence

10.1 Documentation Deliverables

See 00_DOCUMENT_CHECKLIST.dox for complete list of 29 documents.

10.2 Evidence Package for Notified Body

Assessment Package includes:
- Safety Case
- All requirement/design/test documents
- Code review and static analysis reports
- Source code (under version control)
- Test logs and coverage reports
- HARA and risk assessment
- Deviation management

10.3 Storage & Access

  • Location: [Repository path / System]
  • Access: [Team members, Notified Body]
  • Backup: [Frequency and method]
  • Retention: [Duration - typically 10+ years]

11. Quality Metrics

11.1 Code Quality Targets

Metric Target Verification
MISRA Compliance 100% or documented deviations Static analysis tool
Code Coverage >90% Coverage tool
Cyclomatic Complexity <10 per function Static analysis tool
Code Review Coverage 100% Review checklist

11.2 Schedule Metrics

  • Requirements phase completion: [Date]
  • Design phase completion: [Date]
  • Code completion: [Date]
  • Testing completion: [Date]
  • Assessment readiness: [Date]

12. Communication & Reporting

12.1 Stakeholder Updates

  • Monthly: Status report to Program Manager
  • Bi-weekly: Team syncs
  • Quarterly: Steering committee review

12.2 Issue Escalation

  • Critical (SIL violation): Immediate escalation to Functional Safety Manager
  • Major (schedule impact): Weekly escalation
  • Minor (tracking): Sprint review

13. Approval

Role Name Signature Date
Functional Safety Manager
Project Manager
System Architect
Quality Assurance Lead

14. Change History

Version Date Author Change
0.1 [Date] [Name] Initial draft
1.0 [Date] [Name] Approved by FSM

References

  • EN 50128:2011
  • EN 50129:2018
  • MISRA C:2012
  • RteFramework Documentation
  • Project Charter
  • [Other standards specific to your system]